U.S. construction · site drainage

French drain planner.

See fall, changing trench depth, gravel after cover and pipe displacement, fabric wrap, stock lengths, couplers, and spoil before the first shovel goes in. Calculations run locally; this tool does not transmit your form values.

Advertisement

Trench profile and materials

Profile
An entered assumption, not a recommendation.
Positive if end ground is higher; negative if lower.
Pipe, cover, and wrap
Reserved above the gravel zone. Set 0 for gravel to grade.
Fabric wraps the gravel-zone bottom and sides, plus this overlap.
Order allowances

Drain profile and order

StartEnd
Advertisement

Formula, source, and limits

Method reviewed September 30, 2026: fall equals horizontal run × entered slope. Ending depth equals starting depth + ending ground elevation change + fall. Excavation uses the full changing-depth trench prism. Gravel reserves your entered top cover depth, then subtracts cylindrical pipe displacement before allowance. Fabric wraps the bottom and sides of that gravel zone plus your overlap.

Trade source: the NDS French Drain Installation Guide, accessed September 30, 2026, describes a sloped trench with perforated pipe, gravel, and landscape fabric directed to an outlet. The USDA NRCS Subsurface Drain Standard 606, July 2022, documents filter and envelope considerations; it is not used here as a residential design prescription.

Boundary: This is geometry and purchasing math, not hydraulic sizing, code review, outlet approval, excavation safety, or engineering. Confirm utilities before digging and verify soil, groundwater, discharge rights, permits, and local drainage requirements.

How much gravel does a French drain need?

Gravel is a volume problem: the trench cross-section times its length, minus the room taken up by the pipe. In formula form, gravel = width × (average trench depth − top cover) × run − pipe displacement, then your allowance for settling and spillage. The same volume formula is used by Omni Calculator's French drain page, which subtracts the pipe's cylindrical volume (π × outside diameter² ÷ 4 × pipe length) from the trench volume. This planner adds three things on top of the basic formula: the trench gets deeper or shallower along its length as the pipe falls and the ground changes, a top-cover depth is reserved for soil or sod, and the output includes fabric, pipe lengths, couplers and spoil.

Worked example: the default 100 ft drain

Run 100 ft, slope 1%, starting depth 18 in, ground dropping 1 ft over the run, trench 12 in wide, 4 in pipe in 10 ft sticks, 4 in top cover, 12 in fabric overlap, 10% gravel and fabric allowance, 5% pipe allowance.

That works out to 4.4 cu yd for 100 ft, or about 1.19 cu ft per linear foot with the allowance. A second case, 40 ft at 1% with a 20 in start, flat ground and a 10 in trench, gives a 4.8 in fall, a deepest point of 24.8 in, 1.94 cu yd of gravel, 216 sq ft of fabric, 5 sticks of pipe, 4 couplers and 2.30 cu yd of spoil. Gravel is often sold by weight, so ask the supplier how many tons are in a cubic yard of the stone you are buying, because it varies with the rock.

Choosing slope, width, depth and stone

The planner treats slope as your input and does not recommend one. Published guidance differs: NDS's installation guide says a French drain should drop at least 1 percent and notes that some experts suggest a 2 percent minimum when corrugated pipe is used, while a general reference describes an inclination of 1 in 100 to 1 in 200 as typical. Follow the pipe manufacturer's instructions and local requirements. For the trench, NDS describes about 5 to 6 inches wide for small problems and a wider trench for larger ones, with depth anywhere from eight inches to two feet depending on need; the planner's 12 in by 18 in default is only a starting point. NDS says gravel can range from pea gravel to larger river rock, with smaller pieces nearest the pipe; a general reference describes grading from coarse in the middle to fine on the outside and a non-woven geotextile that keeps fines and roots out of the drain. Whether to use a perforated pipe at all is a design choice: the drain can work with or without one.

Before you dig

Locate buried utilities first. In the US, 811 asks you to contact the service a few business days before any digging, regardless of depth. In Ontario, the Dig Authority asks for a locate request at least 5 business days before you break ground, and a new request if the project changes. Also check where the water will go. An outlet that floods a neighbour or a protected area is a legal problem, and this tool cannot judge it.

Common mistakes

What this planner does not cover

It is geometry and purchasing math. It does not size flow capacity, test soil or groundwater, approve an outlet, choose between a surface and a subsurface solution, or satisfy permits. For stone quantities in other jobs use the gravel calculator and the retaining wall drainage stone calculator; for the roof water that often causes the problem, the gutter and downspout flow calculator; and for pit-based drainage, the sump pump sizing calculator.

Frequently asked questions

Does the planner choose a slope?

No. You enter the project slope; the page shows the resulting fall and changing depth without claiming a universal value. Published guidance varies, so follow your pipe manufacturer's instructions and local requirements.

Are top cover and pipe displacement removed from gravel?

Yes. Enter the topsoil, sod, or other cover depth you intend to reserve. The calculator then subtracts the sloped pipe cylinder from the remaining gravel zone before applying the allowance.

Does this approve the outlet?

No. The outlet and its effects are site and jurisdiction decisions. Confirm them before ordering or excavation. Discharging onto a neighbour's land or into a regulated area can be a legal problem that this tool cannot judge.

How much gravel do I need per linear foot of French drain?

Multiply the trench width by the gravel depth (trench depth minus top cover) and subtract the pipe area. A 12 inch wide drain with 14 inches of gravel and a 4 inch pipe needs about 1.08 cubic feet per foot, or about 1.19 with a 10 percent allowance. For 100 feet that is roughly 4.4 cubic yards.

What slope should a French drain have?

Published guidance varies. NDS says a French drain should drop at least 1 percent and notes some experts suggest 2 percent for corrugated pipe, while a general reference gives 1 in 100 to 1 in 200 as typical. Use the pipe manufacturer's instructions and local requirements, then enter your choice into the planner.

How wide and deep should a French drain trench be?

NDS describes a trench of about 5 to 6 inches wide for small problems, wider for larger ones, and a depth anywhere from 8 inches to 2 feet depending on needs. The planner defaults to 12 inches wide and 18 inches deep, which is only a starting point you can change.

What size gravel should I use?

NDS says gravel can range from pea gravel to larger river rock, with smaller pieces nearest the pipe. A general reference describes grading from coarse in the centre to fine on the outside to prevent clogging. Ask your supplier which stone suits your soil.

Do I have to call before digging a French drain?

Yes, locate buried utilities before any digging. In the United States 811 asks for a call a few business days before digging, and in Ontario the Dig Authority asks for a locate request at least 5 business days before you break ground.

Sources

Advertisement