Home energy · heating costs
Heating cost per GJ, fuel against fuel.
Gas, propane, oil, electricity, a heat pump and wood, all converted to cost per GJ and per kWh of heat delivered. You supply the prices; nothing leaves your browser.
Prices and efficiencies
Fill in only the heat sources you are weighing. Rows left blank are skipped.
Cost of delivered heat
How it works
For each source: cost per kWh of delivered heat = price per unit ÷ (kWh of energy per unit × efficiency). Cost per GJ = cost per kWh × 277.78 (1 GJ = 277.78 kWh, since 1 kWh = 3.6 MJ). For the heat pump, the efficiency is its COP (a COP of 2.5 means 250% efficient) and the price is the electricity price you entered. Annual cost = cost per GJ × delivered heat in GJ.
Energy content used
Natural gas 1,036 Btu per cubic foot (about 10.72 kWh per m³); propane 91,452 Btu per US gallon (about 7.08 kWh per litre); heating oil 138,500 Btu per US gallon (about 10.72 kWh per litre); wood 20,000,000 Btu per cord (about 5,862 kWh); electricity 3,412 Btu per kWh; 1 therm = 100,000 Btu. Unit conversions: 1 US gallon = 3.785411784 L, 1 m³ = 35.3146667 ft³.
Worked example
Illustrative prices only, not market data: heating oil at $1.50 per litre in an 85%-efficient furnace. Oil carries 138,500 ÷ 3,412 ÷ 3.7854 = 10.72 kWh per litre, so delivered heat costs 1.50 ÷ (10.72 × 0.85) = $0.165 per kWh, about $45.71 per GJ. Electricity at $0.14 per kWh through a heat pump with a seasonal COP of 2.8 costs 0.14 ÷ 2.8 = $0.05 per kWh, about $13.89 per GJ, while the same electricity in baseboards costs $0.14 per kWh (about $38.89 per GJ). A home needing 80 GJ of heat a year would pay about $3,657 for the oil and $1,111 for the heat pump on those assumed prices.
Sources and as-of date
U.S. EIA, British thermal units (Btu) heat content table (natural gas, propane, heating oil, wood, kWh and therm values; page opened 2026-10-01). These are U.S. reference averages; actual fuel energy content varies by supplier, and Canadian supplier bills may state their own. The EIA page shows no revision date.
No prices or efficiencies are built in, because rates change by region and month and equipment varies. This is a planning estimate, not a quote or engineering advice.
Why dollars per GJ of delivered heat is the fair comparison
Natural gas is sold in cubic metres or gigajoules, oil and propane in litres, wood in cords and electricity in kilowatt-hours. A price per unit tells you nothing until you convert it to the same energy unit and account for how much of that energy becomes heat in your home. The calculator therefore divides the price by the fuel's energy per unit and by the equipment efficiency, giving cost per kWh of delivered heat, then multiplies by 277.78 kWh per GJ because 1 kWh is 3.6 MJ.
Fuel energy content and unit conversions
The built-in energy contents are the U.S. Energy Information Administration's reference values: natural gas 1,036 Btu per cubic foot, propane 91,452 Btu per U.S. gallon, heating oil 138,500 Btu per U.S. gallon, wood 20,000,000 Btu per cord, and 3,412 Btu per kWh. Converted, one cubic metre of natural gas is about 10.72 kWh, or about 0.0386 GJ (38.6 MJ). A gas bill that lists gigajoules needs no conversion. Your supplier's bill may state a different heat content, so use it if it does.
Full worked comparison
These prices are assumptions for illustration, not market data. Natural gas at $0.55 per cubic metre in a 96% furnace costs 0.55 ÷ (10.72 × 0.96) = $0.0534 per kWh of heat, or $14.84 per GJ. Oil at $1.50 per litre in an 85% furnace costs $45.71 per GJ. Electricity at $0.14 per kWh in baseboards (100%) costs $38.89 per GJ, and the same electricity through a heat pump with a seasonal COP of 2.8 costs $13.89 per GJ. For a home needing 80 GJ a year that is about $1,187 for gas, $3,657 for oil, $3,111 for baseboards and $1,111 for the heat pump.
| Source | Assumption | Cost per GJ | Annual cost |
|---|---|---|---|
| Natural gas | $0.55/m³, 96% | $14.84 | $1,187 |
| Heating oil | $1.50/L, 85% | $45.71 | $3,657 |
| Electric baseboard | $0.14/kWh, 100% | $38.89 | $3,111 |
| Heat pump | $0.14/kWh, COP 2.8 | $13.89 | $1,111 |
The break-even COP against gas
In this example gas heat costs $0.0534 per kWh. A heat pump on $0.14 electricity matches that when COP is 0.14 ÷ 0.0534 = about 2.6. Above that it is cheaper to run; below it, more expensive. This is the number to compare with a real winter COP, not a mild-weather rating.
Finding your own prices
- Use the marginal price. For gas, include supply plus the per-volume delivery and other variable charges; leave out fixed monthly charges. The Ontario Energy Board sets natural gas supply rates four times a year for Enbridge and EPCOR customers, and approves delivery charges separately.
- Electricity plans differ. The Ontario Energy Board lists time-of-use, ultra-low overnight and tiered plans, with rates set once a year on November 1, so enter the average per-kWh price for the hours your heating runs.
- Efficiency. Use AFUE for furnaces and boilers, and a seasonal COP for heat pumps. Rated figures are test values and your installation can differ.
What this does not include
Equipment and installation cost, maintenance, fixed monthly charges, carbon pricing, and the comfort and reliability differences between systems are outside the calculation. To turn a cost difference into a payback period, use the heat pump savings calculator.
Frequently asked questions
Why compare per GJ or kWh of delivered heat?
Fuels are sold in different units (cubic metres, litres, gallons, cords, kWh). Dividing price by the energy in a unit gives cost per unit of fuel energy; dividing again by efficiency gives cost per unit of heat that actually reaches the house, which is the fair basis for comparison.
What efficiency should I use?
Use the rating on your equipment: AFUE for furnaces and boilers, a seasonal COP for a heat pump, 100% for electric resistance at the point of use. A rated figure is a laboratory or test-procedure number; installation, ducts and climate change real results.
Why does a heat pump often win against electric resistance?
Resistance heat delivers at most 1 kWh of heat per kWh of electricity. A heat pump moves heat and delivers COP kWh per kWh, so at the same electricity price its heat costs 1/COP as much.
Are these energy contents exact for my fuel?
They are U.S. EIA reference values. Actual natural gas, propane and oil vary by supplier, and wood varies a lot by species and moisture. Natural gas bills in GJ need no conversion, which is why GJ is offered as a price unit.
Does the result include equipment, maintenance or carbon charges?
No. Only fuel or electricity cost per unit of delivered heat. Add delivery fees, fixed monthly charges and any carbon pricing to the price you enter if they apply to your bill.
How do I convert a natural gas price per cubic metre to cost per GJ?
Divide the price by the heat content of a cubic metre, about 0.0386 GJ using the EIA reference value, and by furnace efficiency. For example $0.55 per m³ at 96% efficiency is 0.55 ÷ (0.0386 × 0.96) = about $14.84 per GJ of delivered heat.
At what COP does a heat pump beat natural gas?
When electricity price divided by COP is below the gas cost per kWh of delivered heat. With $0.14 electricity and gas at $0.0534 per kWh of heat, the break-even COP is about 2.6.
Should I enter my average bill price or the marginal price?
Use the marginal price per unit, because heating adds to usage at that price. Exclude fixed monthly charges, and for electricity use the average of the time-of-use periods in which your heating runs.
Sources
Retrieved
Every link below was opened and read in October 2026. The note after each link says which statement on this page it supports.
- U.S. EIA, British thermal units (Btu) (retrieved 2026-10): heat contents of natural gas, propane, heating oil, wood and electricity; therm and kWh values
- Ontario Energy Board, Natural gas rates (retrieved 2026-10): gas supply rates are set four times a year for Enbridge Gas and EPCOR; delivery rates are approved separately
- Ontario Energy Board, Electricity rates (retrieved 2026-10): time-of-use, ultra-low overnight and tiered plans; prices set annually on November 1
- NIST SP 811 Appendix B.8 conversion factors (retrieved 2026-10): 1 U.S. gallon = 3.785411784 L