Canadian · Toronto · Renovation

What will Toronto charge for your building permit?

Toronto prices a permit as a rate per square metre times the area of the work, with a minimum fee. This uses the City's own rates effective 1 January 2026.

A 100 m² new house or addition is $1,856.00 at $18.56 per m². Finishing a 60 m² basement is $372.00 at $6.20 per m². Nothing costs less than the $214.79 minimum.

City of Toronto onlyRates effective 1 Jan 2026Verified 29 September 2026

Advertisement

Inputs

m²
Toronto measures to the outer face of exterior walls, including attached garages. For an interior renovation, use the total area affected. 1 m² = 10.764 sq ft.
m
Toronto adds $56.33 for each new residential unit in the application (for example a secondary suite). Leave at 0 for a single-family addition.

Estimated City fee

Fill the form and press Estimate fee.

Every rate used

WorkToronto rate

Source, read 29 September 2026: the City of Toronto's own Building Permit Fees page, where each rate is marked "Fee Effective Jan. 1, 2026". The City's stated formula is permit fee = service index x area of work, and "a minimum fee of $214.79 (2026) shall be charged for all work". The Zoning Certificate fee is stated there as 25 per cent of the total prescribed building permit fee.

Frequently asked questions

How does Toronto calculate a building permit fee?

Rate per square metre for the type of work, multiplied by the floor area of that work, with a $214.79 minimum for any permit. Some work, such as a deck, porch or detached garage, is a flat $214.79.

Does this cover other cities?

No. Every figure here is Toronto's. Other Ontario municipalities set their own fees under their own by-laws, so do not reuse these rates for them.

What is not included?

HVAC and plumbing permits, development charges, Committee of Adjustment or other planning applications, and any Zoning Applicable Law Certificate flat fees are separate City charges and are not modelled.

An estimate, not a quote

These are the City of Toronto's published 2026 rates as read on the verification date. Toronto revises fees each January, and the City decides the final assessed area and fee when it reviews your application. Confirm on toronto.ca before budgeting.