Canadian · Municipal rules · Home projects

Deck permits: the height line in each city.

Toronto asks for a permit above 60 cm, Calgary above 0.6 m, Mississauga above 0.61 m and Halifax for every new deck. This page lines up the wording, the fee and the extra triggers, with the bylaw each city uses.

A 45 cm freestanding deck: no building permit listed in Toronto, Calgary or Mississauga; a $121.92 permit in Halifax. At 90 cm it is $214.79 in Toronto, $205.92 in Calgary and $244.00 in Mississauga.

Toronto, Calgary, Edmonton, Mississauga, HalifaxFees read 20 October 2026

Advertisement

Check a deck

Enter the height of the highest point and pick a city. The result says what the city page lists, not what you must do.

Deck result

Advertisement

The deck rule in five cities

Most Canadian cities hang the deck permit on height above grade, usually about 60 cm (24 inches or 2 feet). Below that line a freestanding deck is often outside building-permit rules; above it, a permit and an inspection follow. Halifax is the outlier: its deck page asks for a permit for a new deck without a height exemption. The table shows each city's wording, the fee, and where it comes from.

Deck permit wording and fees (read 20 October 2026)
CityWhen the city lists a building permit for a deckBuilding-permit feeOther permits and triggersAuthority
TorontoA deck more than 60 cm (24 in) above ground. An uncovered platform no more than 60 cm above adjacent finished grade is listed as not needing one, provided it is not part of a required exit and complies with the Zoning Bylaw. A porch or deck built as an addition, or enclosing a deck, is listed as needing a permit.$214.79 flat for a residential deck, carport or porchZoning Applicable Law Certificate is a separate fee; a fence on an unroofed deck may be up to 2.0 m above the deck surfaceToronto Building pages; Municipal Code Chapter 441, Chapter 447
CalgaryAn uncovered deck whose surface is higher than 0.6 m (2 ft) above grade at any point, or rebuilding, extending or adding stairs to one. Not required at 0.6 m or lower at every point.$205.92 total ($112 processing + $86 base + $7.92 safety codes council fee)A Development Permit ($550) is also required if the deck is at the front of the home, closer than 1.2 m to a side property line, closer than 6 m to the rear property line, or in or near a floodway; a trade permit for electrical or plumbingCity decks page; 2026 Building & Trade Permit Fee Schedule
EdmontonThe fee schedule lists "uncovered deck" among home improvement development permits and among minor residential building permits. It does not state a height exemption.$120 building permit + $4.80 safety codes fee, plus a $145 development permit: $269.80 in allMechanical and electrical permits are separatePlanning and Development Fee Schedules, effective 1 January 2026
MississaugaA deck greater than 0.61 m (2 feet) high. A deck less than 600 mm (2 feet) in height is on the no-permit list.$244.00 each for decks, porches and basement walkouts to housesZoning by-law rules still apply; the City lists a $244.00 minimum for Part 9 residential projectsBuilding By-law 0236-2024, Schedule B (2026)
HalifaxA Deck Permit is required for the construction of a new deck or the replacement of an existing deck. The page does not list a height exemption.$6.88 per $1,000 of project value, minimum $31.25$60 basic Development Permit fee; the permit expires 2 years after issue; footing and final inspectionsAdministrative Order 15 fee table (effective 1 April 2024); City deck page

How the height test works

Calgary tests the highest point of the deck surface above grade, not the average, and says "at any point" and "at every point" explicitly. On a sloping lot a deck can be 40 cm above grade at the house and 90 cm above it at the far edge, and the higher number decides. Toronto frames the test as the finished deck level above the adjacent finished grade. Mississauga gives the height as 0.61 m in one list and 600 mm in another, which leaves a 10 mm gap that the City will have to settle if your deck sits exactly there.

Calgary adds a second layer that Toronto and Mississauga do not spell out on the same page. Even when no building permit is needed, its Development Permit triggers can apply: a deck at the front of the home, closer than 1.2 m to a side line or closer than 6 m to the rear line. A Development Permit takes much longer than a building permit; the City says the building permit review takes about 7 days, and a development permit that has to go through the full process is about 60 days plus a 21-day advertisement and appeal period, for a total of 10 to 12 weeks. Calgary also publishes design limits for decks under its Land Use Bylaw: a maximum height of 1.5 m for a deck that is not on the same facade as a basement walkout entry, and a privacy wall at least 2.0 m and not more than 3.0 m high where a deck or balcony is within 1.2 m of a shared property line for a semi-detached, rowhouse or townhouse.

A worked example (hypothetical)

A 4 m by 3 m freestanding rear deck, valued at $9,000, built 45 cm above grade. Toronto: under 60 cm, so the City's list says no building permit (zoning still applies). Calgary: under 0.6 m, so no building permit; the Development Permit triggers (front of home, 1.2 m side, 6 m rear) still need checking. Mississauga: under 600 mm, so none. Halifax: a Deck Permit at $6.88 x 9 = $61.92 plus the $60 development permit fee, or $121.92. Edmonton: the fee schedule prices an uncovered deck at $269.80 when a permit applies.

Raise the same deck to 90 cm and the answer flips in Toronto ($214.79), Calgary ($205.92, plus $550 if a development permit is triggered) and Mississauga ($244.00). Halifax does not change ($121.92) and Edmonton does not change ($269.80). The cost of raising a deck by 45 cm is a building permit and an inspection in three cities and nothing extra in the other two.

Edge cases and common mistakes

Who this is for

Homeowners deciding how high to build, contractors quoting decks across the GTA, Alberta and Nova Scotia, and buyers checking whether the deck on a listing was likely permitted. Use the calculator for a quick read of the city wording, then confirm your lot with the city before you build.

What this page does not cover

Advertisement

Common mix-ups

  1. City of Toronto: When do I need a building permit?
  2. City of Calgary: Decks

Checked against these sources on .

Frequently asked questions

How high can a deck be in Toronto without a permit?

Toronto lists constructing a deck more than 60 centimetres (24 inches) above ground as needing a building permit. An uncovered platform whose finished level is not more than 60 cm above adjacent finished grade is listed as not needing one, provided it does not form part of a required exit and complies with the Zoning Bylaw.

When do I need a building permit for a deck in Calgary?

Calgary requires a Building Permit for an uncovered deck whose surface is higher than 0.6 m (2 ft) above grade at any point, and for rebuilding, extending or adding stairs to such a deck. It is not required for an uncovered deck 0.6 m or lower at every point.

Does a low deck in Calgary still need a development permit?

It can. Calgary says a Development Permit is required if the deck is at the front of the home, closer than 1.2 m to a side property line, closer than 6 m to the rear property line, or within or near a floodway, and lists the fee at $550.

What is the deck permit rule in Mississauga?

Mississauga lists a deck greater than 0.61 metres (2 feet) high as needing a building permit and a deck less than 600 mm (2 feet) in height as not needing one. The fee for decks, porches and basement walkouts to houses is $244.00 each.

Does every deck need a permit in Halifax?

Halifax says a Deck Permit is required for the construction of a new deck or the replacement of an existing deck, and its page gives no height exemption. The fee is $6.88 per $1,000 of project value with a $31.25 minimum, plus a $60 development permit fee.

What does a deck permit cost in Edmonton?

Edmonton's 2026 fee schedule lists a $145 development permit for an uncovered deck and a $120 building permit for minor residential projects, plus a $4.80 safety codes fee, which is $269.80 in all. It does not state a height exemption.

How long does a deck permit take?

Calgary says a deck building permit review takes about 7 days, and a development permit for a deck that does not meet all Land Use Bylaw rules takes about 60 days plus a 21-day advertisement and appeal period. Other cities do not state a standard time on the pages read.

Why is Vancouver or Ottawa not listed?

Their permit pages could not be read in full when this page was built, so only cities whose own documents were read are shown. Check those cities directly.

Sources

Retrieved

City documents only. Each link was opened on the retrieval date and the figures above were read from it. Cities revise fee schedules, usually each January, so the city’s own page is the authority.

Reference table, not an official quote

TNAADO summarises published municipal fees and thresholds and links to the source. It does not collect anything you enter, does not look up any registry, and is not the City. Nothing here is legal, planning or building advice. Fees and rules were read on 20 October 2026 and can change; confirm with the city before you apply or build.